Things are really started to move at Pinehurst Cottage.
The shingles were put on the roof. The electrical and plumbing is being installed. Tile is installed in bathroom 1. The family room fireplace got delivered and the exterior doors were delivered and installed.
Fireplace Wood burning Insert
Front exterior with new doors.
New Exterior Doors (1 of 4)
Accent window added into bedroom and the original window from bedroom moved into the new bath.
Interior view of the new exterior door.
Shower and Floor Tiles
1 comment:
I love the door! And the bathroom floor is so vintage! Really pretty:-)
Post a Comment