Friday, May 24, 2013

A Big Day Yesterday

 The appliances were delivered and installed yesterday and the floors were stained with their first coat of stain.  We're waiting for the cabinet knobs to be delivered and the plumber to install the faucet.  Completion is nearing! 

 


 Bringing back to life 100 year old floors.
 
 The fireplace and hearth in the library will be re grouted and an old English inspired gas coal insert will be installed.  See below. 

 
 




2 comments:

Anonymous said...

Amy, I just found your blog and LOVE what you are doing. I am about to remodel one of our baths and am anxious to know what some of the items are that you are using in your bath. Specifically, can you tell me the makers and models of your (1) shower and tub trim, (2) your vanity faucet, (3) your vanity sink and (4) your tub? I love it all!

Thank you so much,

Jenny C.

Anonymous said...

Amy, I just found your blog and LOVE what you are doing. I am getting ready to remodel one of our baths and a lot of what you are using is exactly what I want. Can you tell me the makers and models of your:

1. tub
2. tub and shower hardware
3. faucet hardware
4. sink

Thank you so much!

Jenny C.